Back to home

IoT consulting for connected products: foundation first, then features.

Vendor-neutral IoT consulting for manufacturers of connected products, from the industrial engine through the vehicle to the device in the home, and for investors. New product, platform migration or redesign: it starts with who owns the fleet, how a fix reaches every device, and what happens when the cloud, the module or the network reaches end of life before the product does.

A device in layers, the top one crackedPricing and operating modelTechnology
  1. Pricing and operating model
  2. Technology
Technology alone has never made a business.Illustration · AI-generated

My offer at a glance

Free first step30 minor CRA self-check, 10 min
Entry
Architecture and platform audit4 weeks · fixed feeA memo with end-of-life dates and a 12-month roadmap
If the CRA is the trigger: one-day workshop
Alongside youoptional
Strategy engagement6–12 weeksA roadmap with a cost envelope
Or: Platform selection and migration with client-side representation
Interim or fractionalalso direct, no audit first
Interim Head of IoT / Connected Products3–9 monthsHandover to a named person with a budget
Formats in detail: what it is, what you have at the end

Since 2001 I have worked on the vendor side of device software and IoT platforms, and in a carmaker’s FOTA programme I was the Business Owner responsible for the customer.

Three formats, each with a result.

The next step is always optional.
  1. Architecture and platform audit

    Entry · 4 weeks · fixed fee
    What it isThe six decisions for one product or fleet, before launch, before a platform migration or before a redesign: the current state per decision, end dates across the whole stack, requirements under the CRA and the Data Act. For investors, the same questions put to a target company, firmware and OTA included.
    ResultA written memo with the current state per decision, a timeline of end dates and a 12-month roadmap; optionally a briefing for the board or investors.
  2. Strategy engagement — connected products

    6–12 weeks
    What it isFrom the customer problem to the business model, and in a redesign to the new architecture: use cases, who pays for operations, pricing and operating model, requirements for engineering, a phased plan.
    ResultA roadmap with a cost envelope that the board and engineering commit to.
  3. Interim Head of IoT / Connected Products

    Interim · 3–9 months
    What it isI take over the path from the build server to the field, and in a platform migration the migration too: inventory, end dates across the stack, customer commitments and campaigns, with authority over the device and platform teams.
    ResultA named person in your company takes over the role with a budget, after a documented handover; then the mandate ends.
Option: platform selection and migration with client-side representation. Specification, selection and sign-off of an IoT or OTA platform, measured against the six decisions; for a migration with a migration plan and a rollback path for devices that stay offline for long periods. I never bid on the build.
All formats and terms
No referral fee, no revenue share, no reseller margin from any vendor I recommend to you.

Written into the contract, platform selection included. No company I advise on go-to-market goes onto a longlist. Where that overlaps, I disclose it and step out of the selection.

Your situation decides where we start.

Behind the manufacturers’ situations sit the same six decisions, shown in the next section.

  • A new product or the next generation

    The six decisions are taken before the first device ships, and again with every new generation.

    EntryArchitecture and platform audit

  • Moving off the current IoT platform

    The vendor discontinues it, the costs rise or the platform no longer fits the product. The migration has to go out through the old platform while it still runs, including to devices that stay offline for months.

    EntryAudit, then platform migration with client-side representation

  • A redesign is due

    A module is discontinued, a network switched off, the architecture cannot deliver signed updates or keep a CRA support period, or it no longer scales.

    EntryAudit, then strategy engagement

  • The Cyber Resilience Act for products in the field

    The reporting obligation has applied since 11 September 2026, to products already sold as well, and the whole CRA applies from December 2027. Both come down to product decisions: what a support period costs and what evidence you need from suppliers and the platform.

    EntryOne-day workshop, audit or Interim Head of IoT / Connected Products · CRA self-check, 10 minutes

  • It works technically, not commercially

    The product works, but the pricing and operating model does not cover running it, or nobody earns from it after the sale.

    EntryStrategy engagement

The foundation of connected products

Six decisions before the first device ships.

A connected product stays in the field for many years, industrial equipment for ten to twenty, and the CRA requires security updates for a support period of at least five, shorter only where the product is expected to be in use for less. What is not decided at launch is paid for later, in service calls, recalls and migrations. A platform migration or a redesign means taking the same six decisions again, this time with a fleet in the field.

  • OwnershipWho owns the whole path from the build server to the device in the field, with a budget for a migration?
  • Update pathDoes a fix reach every device generation, in stages and with a rollback path, including the device that was offline for a week?
  • Chain of trustWho signs, with which key, where is it kept, and what happens when it has to be revoked?
  • Lifetime and exitWhich support period is stated at the sale, and what happens when the cloud, the module or the network reaches end of life first?
  • Data and asset semanticsWho may use which device data, and in which model does it sit, so that analytics and later agents can understand it?
  • Operations and business modelWho pays for running it over its whole life, and what does the product earn after the sale?

In full: why OTA stops being optional · ten checks for an IoT stack under the CRA. One level higher, with AI agents: the Agentic Operating Model.

Your product stays in the field longer than the platform beneath it.

CRA reporting from 11 Sep 2026, also for devices in the fieldCRA in full from 11 Dec 2027, for newly placed productsTODAYYour device in the fieldExample: 2022 to 203715 years of use, updates the whole timeEdge: Greengrass V1END 7 Oct 2026Edge: IoT Edge 1.5 LTSEND 10 Nov 2026Cellular: 2G TelekomEND 30 Jun 20288½ years in the field without 2G20202025203020352040
TODAYYour device in the field, example to 2037Edge: Greengrass V17 Oct 2026Edge: IoT Edge 1.5 LTS10 Nov 2026Cellular: 2G Telekom30 Jun 20288½ years in the field without 2G2025203020352040

Dashed: CRA reporting from 11 Sep 2026, also for devices in the field; the full CRA from 11 Dec 2027 for newly placed products.

What the audit delivers: this axis for your stack, with every end date, and what ends before the device does.

End dates of platforms and networks, with sources →

How I know this.

  • Over 1 millionhouseholds and industrial enginesOSGi gateways in over a million households and a million connected industrial engines. Connected products in the field, operated over years.
  • Over 4 millionvehicles · FOTABusiness Owner at Bosch.IO, responsible for the customer, a global automotive manufacturer: updates to vehicles in the field.
  • Since 2001in standards bodiesIn the OSGi Alliance since 2001. Four of those years on the board, four on the Steering Committee of the OSGi Working Group at the Eclipse Foundation, plus co-chair of the OTA SIG at the Industrial Internet Consortium.
My writing on this
What others say

Where a connected product gets locked in.

The six decisions are taken in the technology. These are the fields where I ask the questions, as things stand in October 2026.

Edge

A product stays in the field for ten years and more, an LTS release of the edge runtime for about two and a half: Microsoft’s IoT Edge 1.5 LTS ended on 10 November 2026, 1.6 LTS ends on 14 November 2028. So the runtime gets replaced several times in the field. AWS discontinued support for Greengrass V1 on 7 October 2026.

The questions
  • What has to keep working without the cloud, and for how long?
  • Container runtime or monolithic firmware, and who maintains the runtime for the whole service life?
  • Does inference run on the device, the gateway or in the cloud?
  • Container
  • Greengrass V2
  • IoT Edge 1.6 LTS
  • LiteRT

Device management

Device identity is the hardest thing to retrofit: keys generated in, or injected into, a secure element at the factory, and a PKI that outlives the certificates in the field. Then the radio generation: Telekom plans to switch off 2G in Germany by 30 June 2028.

The questions
  • Where does identity come from, and who runs the PKI, for how long?
  • A standard agent such as LwM2M or USP, or your own?
  • What does decommissioning mean: revoking keys, deleting data, transferring ownership?
  • LwM2M 1.2
  • TR-369 USP
  • TR-069
  • SGP.32 eSIM
  • LTE-M
  • NB-IoT
  • 5G RedCap

Contributed to TR-069 and TR-157 in the Broadband Forum, to UPnP Device Management and to the Home Gateway Initiative.

OTA and FOTA

An update has three layers: firmware and operating system, applications and containers, AI models. Each needs its own signing keys under the same root of trust and its own rollback path. The CRA requires security updates to ship separately from functionality updates where technically feasible (Annex I, Part II, point 2).

The questions
  • A/B or a single copy with recovery, delta or full image?
  • Which waves, which abort thresholds, and who stops a rollout?
  • How are signing keys rotated, and who may release a rollout?
  • RAUC
  • SWUpdate
  • Mender
  • Uptane 2.1
  • Eclipse hawkBit 1.x
  • UNECE R156
  • CRA Annex I
Why OTA stops being optional →

Protocols

The protocol decides who can still talk to your device in ten years. The radio module, the cellular generation and the data model of the messages lock you in hardest. An MQTT broker can be swapped if endpoint and certificate chain can be changed by update and the device uses no vendor extensions such as shadows, twins or jobs. MQTT without an agreed data model is point-to-point integration again.

The questions
  • What does the product speak natively, what goes through a gateway?
  • Certify in an ecosystem such as Matter, OCPP or EEBus, or stay proprietary?
  • What can no longer be changed by OTA later?
  • MQTT 5
  • Sparkplug 3.0
  • CoAP
  • OPC UA
  • Modbus
  • BACnet/SC
  • KNX
  • Matter 1.6
  • Thread
  • OCPP 2.1
  • ISO 15118-20
  • EEBus

Interoperability and semantics

Whether the information model is an OPC UA companion specification, an asset administration shell or your own has to be settled before launch, because the Data Act requires the data by design, together with the metadata needed to understand it (Article 3(1)).

The questions
  • Which information model is the master?
  • How does Data Act access reach the user: on the device, through an API or through a data-space connector?
  • Join a data space now or wait?
  • OPC UA companion specs
  • Asset administration shell (IEC 63278)
  • Eclipse Ditto
  • Matter
  • Catena-X
  • Manufacturing-X
  • Data Act Art. 3

Ecosystems

Platforms end. Google shut down Cloud IoT Core on 16 August 2023, AWS ended support for IoT Analytics in December 2025 and for IoT Events in May 2026; IBM has not sold the Watson IoT Platform since December 2020, and since 23 September 2026 Microsoft no longer creates new IoT Central applications. Whoever hard-codes devices to one vendor’s endpoint then migrates under time pressure.

The questions
  • Is the exit in the contract: notice period, data export, moving the devices?
  • Can devices be moved to a new endpoint and certificate chain by OTA?
  • Run open source yourself or buy a service?
  • Eclipse IoT
  • Connectivity Standards Alliance
  • IDTA
  • OPC Foundation
  • Broadband Forum
Who controls the interface: IoT and MCP →

Five industries, each with its own rulebook.

Per industry the challenge, the use cases, what is often missed, and my experience there.

What manufacturers ask.

What do the CRA and the Data Act change for our connected product?

Since 11 September 2026 you have to report actively exploited vulnerabilities and severe security incidents, including for products already in the field (CRA, Articles 14 and 69(3)). For every device placed on the market from 11 December 2027 the CRA applies in full: security updates over a support period of at least five years, shorter only where the product is expected to be in use for less, with its end stated at the sale. A connected product placed on the market after 12 September 2026 also has to be designed so that its data is accessible to the user by default (Data Act, Article 3). In the audit we prepare every requirement technically so that your legal team can decide it, and map it to one of the six decisions.

Our product is already in the field. Is it too late?

No, but the questions shift. For the installed base it is about which devices an update can reach at all, who signs, and which end dates in the stack are already fixed; for the next generation it is the six decisions before launch. The audit keeps the two apart.

We want to move off our IoT platform. How do we go about it?

First the inventory: which devices and generations are in the field, what the old platform does for them, and which contracts and end dates apply. Then select the new platform against the six decisions, before any contract is signed. The migration itself goes out through the old platform while it still runs, with a rollback path for devices that come back online only months later. I have led such a migration myself.

When is a redesign necessary?

When the architecture no longer meets an obligation or will not outlast an end date: a discontinued module, a switched-off network, updates without a signature and a rollback path, a support period the components cannot deliver, or operating costs that grow with every unit. The audit shows what can still be solved in the installed base and what only the next generation can do.

How do we choose an IoT or OTA platform?

Device side first: functional safety requirements, rollback and recovery constrain the platform choice more than the other way round. Then a specification against the six decisions, and a sign-off by someone who earns nothing from the contract. Ask every vendor where the signing key lives.

We already have an IoT platform. Is this still worth it?

Often precisely then: whether the business model on the platform makes money, and whether you could still switch in three years.

Isn’t this just technology consulting?

I ask the technical questions because they have commercial consequences. I had commercial responsibility for an IoT platform, with a P&L, a team and customers.

What ties do you still have to Bosch?

None: no non-compete, no ongoing contracts, no commission. What I learned at Bosch stays confidential.

Last updated

Tell me what it is about.

The introductory call is confidential, with no obligation.

kai@kaihackbarth.com +49 176 4515 1099

Tell me what it is about. The introductory call is confidential, with no obligation.